Apartment handover inspection
An independent inspection of the apartment before you sign the handover protocol with the developer.
From the first sketch to the last detail – we manage the entire process of creating your home.

KAVERA is a general contractor for finishing and furnishing new-build apartments. We take responsibility from design to keys, so you don’t have to coordinate dozens of companies. Project management and design supervision are included – one team runs the project and makes sure the work follows the design exactly.
A detailed specification and bill of quantities. You know what you pay for and why.
The price is fixed in the contract after design and survey. Every change is approved in writing before it is carried out.
One person responsible for the whole project – from the first meeting to handing over the keys.
A written warranty for the completed works with clearly stated periods in the contract.
Photo: The team and contractors discussing a detail on site2400×1350 px · about-team
We work with contractors and suppliers we have worked with before. They all work to our drawings and specifications, and we sign off each stage against a checklist before moving on.
We work as a general contractor: we are responsible for design, supplies, contractors, schedule and quality. You have one contract and one contact person.
Every project starts with a site survey and a design. Only once we know exactly what will be done do we fix the price and deadline in the contract. That reduces the unknowns before the first day on site.
The warranties we receive from contractors and suppliers are mirrored in our contract with you. If something needs attention during the warranty period, you don’t chase individual companies – you contact us and we arrange the repair.
Specific warranty periods are set out in the contract in line with applicable regulations.

Quiet in expression. Clear in detail.
Four packages – from the design to a move-in-ready apartment – each including the previous one. The add-on services below can be combined with any package for specific situations.
All packages start from the “plaster and screed” level. The price is set individually and fixed in the contract after the design and the site survey.
Package 1 · Design and fixed quote
So you know exactly what you will get and what it will cost before any work begins.
Package 2 · Ready for furnishing
All the finishing work – from walls and floors to the bathroom and doors. All that is left is to furnish.
Everything in “Design”
Package 3 · Functionally furnished
We add everything built-in – kitchen, wardrobes, air conditioning and lighting. The apartment works from day one.
Everything in “Foundation”
A short overview of the main works. The full scope is in each package description and in the contract.
Questions about pricing| Design | Foundation | Comfort | Premium turnkey | ||
|---|---|---|---|---|---|
| Site visit, measurement and documentation | |||||
| Layout, 3D visualisations, working drawings | |||||
| Specification and fixed quote | |||||
| Skim coat, painting, ceilings, drywall | |||||
| Flooring and skirting | |||||
| Turnkey bathroom and toilet | |||||
| Interior doors, switches, sockets | |||||
| Project management, design supervision, weekly reports | |||||
| Made-to-measure kitchen with built-in appliances | |||||
| Built-in wardrobes and cabinets | |||||
| Air conditioning, water heater, cooker hood | |||||
| Designed lighting, concealed LED | |||||
| Curtain rails, blinds, curtains | |||||
| Professional cleaning | |||||
| Sofas, beds, tables, chairs | |||||
| Household appliances | |||||
| Textiles, decor, plants | |||||
| Photography | |||||
Every package can be delivered in one of three tiers. The tier changes the materials and the price, not the scope of work.
Quality, proven materials and appliances from established mid-range manufacturers. Good value for money.
A wider choice of finishes and models, more detail and more durable materials.
Natural materials, premium brands and bespoke solutions – more design freedom.
Add-ons can be combined with any package. Their price depends on the property and scope.
An independent inspection of the apartment before you sign the handover protocol with the developer.
We bring the apartment to the “plaster and screed” level where the packages begin.
Relocating electrical points, plumbing outlets and walls while it is still straightforward.
The whole process – without you needing to be in Bulgaria. We speak fluent German and English.
We prepare the apartment to be let right after handover.
Convenience and control over lighting, climate and security.
Furnishing an already renovated apartment – no construction work.
Subscription-based maintenance and property management after handover.
You know what comes next, who is responsible and when. Every step ends with a result you can see and approve.
A phone call, video meeting or office visit. We discuss the property, the construction stage, your wishes and budget. No obligation.
We visit the apartment, measure it and document its initial condition with photos.
We sign a design contract with a clear scope, price and timeline.
Concept → 3D visualisations (up to 2–3 revisions) → working drawings for all trades.
We prepare a materials specification and a bill of quantities. You receive a fixed quote for the works.
One contract with one price, one deadline and one person responsible for the whole project.
Made-to-measure kitchens, doors and furniture take 4–10 weeks to produce. We order them early so nothing is waiting after Act 16.
Before you sign the handover protocol, we inspect the apartment and record any defects in writing, with photos.
We work to a schedule with vetted contractors. Project management and coordination are our job, and design supervision makes sure everything is built to the design.
Every week you receive a report with photos. We sign off each stage against a checklist before moving on.
Cleaning (professional in Packages 3 and 4) and a joint final walkthrough. We resolve any remarks before handover.
We hand over the keys, warranty cards, instructions and documentation of the completed works.
We remain available. If anything needs attention during the warranty period, you have one person to contact.
How long each stage takes in a typical project.
Timelines are indicative. The specific deadline is set in the contract after the design and the site survey.
You pay in stages tied to progress on site. The exact amounts and due dates are set out in the contract.
The first payment is made when the works contract is signed.
Made-to-measure furniture, kitchen and doors are prepaid when ordered from the manufacturer.
You pay as each stage is signed off – after you have seen the completed work.
The final instalment is due when the keys are handed over.
Photo: A specialist checks the flatness of a wall with a straightedge in a new apartment1600×1200 px · home-inspection
Before you sign the protocol with the developer, we inspect the apartment: walls, screed, windows, plumbing and electrical outlets. You receive a written report with defects and photos, and a follow-up check once they are fixed.
Free with a contract for Package 2, 3 or 4
Photo: A video call on a laptop showing a finished kitchen1600×1200 px · home-abroad
Video meetings at times that suit you, weekly photo and video reports, online approval of materials, and property handover and utility accounts under a power of attorney.
Photo: Living room with kitchen in a 2-room apartment1600×1200 px · project-1-cover
Package 3 · Comfort2 rooms68 m²
Placeholder – replace with a real project
Photo: A bright hallway with built-in cabinets in a 3-room apartment1600×1200 px · project-2-cover
Package 2 · Foundation3 rooms92 m²
Placeholder – replace with a real project
Photo: A fully furnished living room, ready to move in1600×1200 px · project-3-cover
Package 4 · Premium turnkey2 rooms64 m²
Placeholder – replace with a real project
No projects match the selected filters.
Usually: gypsum skim coat on walls and ceilings, cement screed on the floor, windows, entrance door, electrical and plumbing outlets. It does not include flooring, tiles, bathroom, interior doors, switches and sockets, lighting or kitchen. The exact scope depends on your contract with the developer.
Not necessarily. Act 16 certifies that the building is fit for use, not that the apartment is turnkey. How far the developer finishes the apartment is set by your contract – check what yours says. This is general information, not legal advice.
Ideally at Act 14. There is then time for an unhurried design, for changes to electrics and plumbing while the walls are still open, and for early orders of kitchen, doors and furniture. We can also start at Act 15 or 16 – the overall time to the keys is then usually longer.
The design and early orders do not depend on Act 16 and continue as planned. The works schedule moves with the actual date we get access to the apartment. The contract describes how such cases are handled – for example storage of furniture that is already made. For your relationship with the developer, please consult a lawyer.
Yes. After the design and site survey, we fix the price in the works contract. If you request a change after signing, it is priced separately and carried out only after your written approval.
Yes. If you continue with Package 2, 3 or 4 after the design, the design fee is deducted from the price of the works.
In stages: an advance when the contract is signed, prepayment of made-to-measure furniture when it is ordered, interim payments as stages are signed off, and a final instalment when the keys are handed over. Exact amounts are in the contract.
You describe the change and we prepare a written addendum with the price and the effect on the timeline. We carry it out only after your approval. The later the change – for example after walls are closed or furniture is ordered – the more it may cost.
We provide a written warranty for the completed works; warranty periods are set out in the contract in line with applicable regulations. Materials and appliances carry the manufacturer’s warranty. We pass the warranties we receive from contractors and suppliers on to you – if there is a problem, you contact us, not the individual companies.
Yes. You can choose materials outside the specification or supply some yourself. The contract states who supplies what, when, and who is responsible for the warranty. For items you supply, the product warranty lies with the manufacturer or seller, while the installation warranty is ours.
The design takes 3–6 weeks. Works for a 2-room apartment with Package 3 usually take 8–12 weeks after Act 16. If the apartment first needs bringing to base level, add 2–4 weeks. Timelines are indicative – the specific deadline is set in the contract.
Yes. We hold video meetings at times that suit you, send weekly photo and video reports, materials are approved online, and the property handover and utility accounts can be handled under a power of attorney. We can also keep the keys for you.
Yes, with a contract for Package 2, 3 or 4. As a standalone service, the price depends on the area and level of completion – just ask.
We have received your enquiry. We will contact you the way you prefer to arrange a free consultation.